1590699 : Application for Computing Resources

Created: 2026-04-09T08:43:45Z - current status: new

Anonymized Summary: A user ([RESEARCHER_TITLE] at [RESEARCH_INSTITUTION]) is requesting temporary access to 1.2 TB of storage and computing nodes on the Maxwell cluster for MHD (magnetohydrodynamics) simulations. They seek confirmation on feasibility and details about application procedures.


Solution/Next Steps:

  1. Storage Allocation:
  2. The Maxwell cluster provides DUST storage (/data/dust/user/$USER), which is suitable for large datasets like simulation outputs.
  3. The user should request access to DUST space by contacting maxwell.service@desy.de (as noted in the Comsol storage documentation).
  4. For 1.2 TB, the user may need to justify the requirement (e.g., project scope, duration).

  5. Computing Resources:

  6. The user should specify:
    • Estimated runtime and node requirements (e.g., CPU/GPU, core count).
    • Whether the simulations are parallelizable (e.g., MPI/OpenMP).
  7. Access to computing nodes typically requires a project proposal (if not already part of an existing project). Details can be found on the Maxwell documentation.

  8. Temporary Access:

  9. If the user is not yet affiliated with a Maxwell project, they may need to apply for short-term access via the DESY IT portal or by contacting the service desk.

  10. Best Practices:

  11. Redirect temporary files (e.g., simulation checkpoints) to DUST to avoid filling /tmp (see Comsol storage context).
  12. Clean up storage regularly to comply with cluster policies.

**Follow-Up Questions for the